Versatility in the construction trades

Versatility in the construction trades

The Act to Modernize the Construction Industry, adopted on May 23, 2024, allows for increased versatility in the trades, under certain conditions, in order to simplify work organization on construction sites.

In the context of work set out in the field of application of Act R-20, versatility extends the range of tasks that the industry’s workers may perform.

For more information on other changes resulting from the Act to Modernize the Construction Industry, consult the “Modernization of the construction industry” section.

The principle of versatility

Section 81 of the Act to Modernize the Construction Industry sets out new terms and conditions concerning versatility that allow holders of journeyperson competency certificates to perform tasks not included in the definition of their trade, if the tasks:

  • Are related to the tasks provided in the definition of their trade
  • Are part of a single work sequence and allow work, including preparatory or finishing work, to progress and continue
  • Are of short duration and performed in a single workday

However, the principle of versatility does not apply:

  • To holders of an apprentice competency certificate 
  • To tasks performed by the following trades: electrician, pipe fitter, fire-protection mechanic, refrigeration mechanic, and elevator mechanic
  • To the operation of cranes of any type and to work related to a structure’s stability or load-bearing capacity

Guide to examples for applying the principle of versatility

Here are some examples to illustrate application of the principle of versatility in the construction trades. Please note that this is not an exhaustive list.

  • Replacing the roof covering on a triplex

     Stage of work

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove the old roof covering Occupation or journeyperson in the trade (residual task)  
    Correct the state of the roof decking by changing a few sheets of damaged plywood as needed Carpenter-joiner Roofer
    Apply the insulation, vapour barriers, and membranes that compose the new covering Roofer  

  • Modification of a building (expanding an access)

     Stage of work

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove the door and its frame Occupation or journeyperson in the trade (residual task)  
    Expand opening to allow installation of a new access Labourer or journeyperson in the trade (residual task)  
    Install the new access (frame)  Carpenter-joiner   
    Install the doors and hardware Carpenter-joiner  
    Install drywall around the perimeter of the frame
    Carpenter-joiner or interior systems installer  
    Fill the joints  Plasterer or painter (only if the task is for preparation and conditioning of the surface to be painted) Carpenter-joiner
    Paint the wall, door, and frame  Painter  Carpenter-joiner 

  • Repair a wall in an apartment

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove a wall panel of drywall  Occupation or journeyperson in the trade (residual task)  
    Install a new wall panel of drywall  Carpenter-joiner or interior systems installer Plasterer or painter
    Fill the joints of the new panel  Plasterer or painter Carpenter-joiner or interior systems installer
    Paint the wall where the repair was made  Painter
    Carpenter-joiner, interior systems installer, or plasterer

  • Repair a sidewalk and concrete steps giving access to a building

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove the aluminum guardrails (handrails) Occupation or journeyperson in the trade (residual task)  
    Break up (with a jackhammer) as necessary so a new layer of concrete can be laid Occupation or journeyperson in the trade (residual task)
    Lay formwork to the sidewalk and steps  Carpenter-joiner 
    Cement finisher
    Pour the concrete  Occupation or journeyperson in the trade (residual task)  
    Finish (smooth) the concrete surfaces  Cement finisher Carpenter-joiner
    Reinstall the aluminum guardrails (handrails)  Iron worker Carpenter-joiner or cement finisher

  • Replace a linoleum floor with a ceramic-tile floor in a bathroom

    Stage of work

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove the linoleum flooring Occupation or journeyperson in the trade (residual task)  
    Reinforce the subfloor by adding a sheet of plywood Carpenter-joiner Tile setter
    Lay the ceramic tile  Tile setter  
    Install the skirting  Carpenter-joiner  Tile setter

  • Installing a gutter during a roof repair

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove old roof Occupation worker or journeyperson in the trade (residual task)  
    Apply the insulation, vapour barriers, and shingles that compose the new roof  Carpenter-joiner or roofer
    Preassemble, attach, and connect downspouts  Tinsmith
    Carpenter-joiner or roofer
    Install the gutter  Tinsmith  Carpenter-joiner or roofer

  • Laying new tiles for a suspended ceiling when the thermal insulation of a piping system is being replaced

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Removing the suspended ceiling to access the piping Occupation worker or journeyperson in the trade (residual task)  
    Removing the thermal insulation to be replaced Occupation worker or journeyperson in the trade (residual task)
    Installing the new thermal insulation on the piping Insulator  
    Mount and install all metallic supports for the suspended ceiling Interior systems installer Insulator
    Place the new tiles for the suspended ceiling
    Interior systems installer
    Insulator

  • Installing a new drywall panel when an electrical outlet is being added

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Cut the drywall panel where the new electrical outlet will be installed Occupation worker or journeyperson in the trade (residual task)  
    Run the wires and connect them to the electrical panel Electrician
    Install an electrical outlet at the new site Electrician  
    Install a new drywall panel to cover the hole
    Carpenter-joiner or interior systems installer Electrician
    Fill the joints of the new drywall panel
    Plasterer or painter Electrician

  • Replacing a plywood floor or wall base before installing ceramic tiles

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Remove the floor or drywall wall
    Occupation worker or journeyperson in the trade (residual task)
    Reinforce the subfloor or the wall by adding a sheet of plywood
    Carpenter-joiner
    Tile setter
    Install ceramic tiles Tile setter  

  • Repairing an existing concrete slab with steps and repairing a decorative brick wall

    Stage of work 

    Trade or occupation that could do the work before integration of versatility

    Trade in which journeypersons may also do the work since integration of versatility

    Break up (with a jackhammer) the existing slab as necessary to receive a new layer of concrete Occupation worker or journeyperson in the trade (residual task)  
    Install formwork for the slab and the steps Carpenter-joiner Cement finisher or bricklayer-mason
    Pour the concrete  Occupation worker or journeyperson in the trade (residual task)  
    Finish (flatten) the concrete surfaces
    Cement finisher Carpenter-joiner or bricklayer-mason 
    Break up the existing wall as necessary to install new bricks in the staircase wall
    Occupation worker or journeyperson in the trade (residual task)
    Cut the bricks to be replaced from the wall
    Bricklayer-mason Cement finisher or carpenter-joiner 
    Lay the rows of bricks for the wall
    Bricklayer-mason Cement finisher or carpenter-joiner

Since the Act to Modernize the Construction Industry has come into force, we have received many questions regarding the application of the principle of versatility. To help you understand it better, here are some examples of what versatility does not allow, based on questions that you have asked us.
  • Examples of what versatility does not allow

    Trade or occupation

    Example of what you cannot do

    Reason

    Plumber Install an electric heater in a bathroom The tasks belonging to the trade of electrician are excluded from versatility.
    Fire-protection mechanic  Do plumbing work in a building The tasks belonging to the trade of pipe fitter, plumbing specialty, are excluded from versatility.
    Carpenter-joiner Install the reinforcement before formwork is placed for a column Work related to the stability or load-bearing capacity of a structure is excluded from versatility.
    Shovel operator
    Doing painting work on a site Tasks performed under the principle of versatility must be related to tasks set out in the definition of the trade of the worker.
    Tile setter   Install a floating floor in a condo unit Tasks performed under the principle of versatility must be related to tasks set out in the definition of the trade of the worker.
    Refrigeration mechanic  
    Install a propane fireplace in a new structure The tasks belonging to the trade of pipe fitter, plumbing specialty, are excluded from versatility.
    Millwright
    Install a new ventilation duct on a construction site Tasks performed under the principle of versatility must be related to tasks set out in the definition of the trade of the worker.
    Ironworker Use a conventional (standard) crawler crane with a capacity of 35 tonnes to install concrete structural elements
     
    Tasks related to the operation of any type of crane and to work related to the stability or load-bearing capacity of a structure are excluded from versatility. 
    General labourer Install a new aluminum guardrail after the old wooden guardrail is removed The principle of versatility applies only to people who hold a journeyperson competency certificate (JCC).
    Painter
    Install all drywall wall panels in a new house under construction and then, several days later, point the joints and paint  The tasks performed under the principle of versatility must be of short duration in a single workday AND be part of a single work sequence.

Questions about the application of versatility?

The CCQ is taking a preventive approach to guide all stakeholders in integration of the principle of versatility. Communication and awareness raising are key to the actions implemented by our teams to help the industry adapt to this new reality.

For any specific question about application of the principle of versatility, you can contact the CCQ:

Have you witnessed a noncompliant situation?

Whether the noncompliant situation is related to versatility or any other subject, you can always report it to us, in complete confidentiality. To make a report, you can:

  • Fill out the online form
  • Contact us at 514 593-3132 or 1 800 424-3512

Frequently Asked Questions

This section contains answers to the most frequently asked questions about the application of versatility.

  • Can a person who holds an apprentice competency certificate (ACC) or an occupation competency certificate (OCC) perform tasks under the principle of versatility?
    No. The principle of versatility applies only to holders of a journeyman competency certificate (JCC).
  • As an employer, how should I declare hours worked under the principle of versatility in my monthly report?
    Hours worked under the principle of versatility must be declared and paid at the wage rate for the trade or specialty indicated on the competency certificate of the journeyperson performing the tasks.
  • Can the task performed under the principle of versatility represent the majority of a worker’s work day?

    No, the task performed must be of short duration in a work day. In other words, the task must not represent the majority of a work day.

    However, this does not exclude the possibility of repeating this short-duration task during one day or several subsequent days – of course, as long as the other conditions of versatility are respected, that is, that the task in question:

    • Is related to the tasks provided in the definition of the trade of the person holding the journeyman competency certificate 
    • Is part of a single work sequence and allows work, including preparatory or finishing work, to progress and continue
  • I hold a journeyman competency certificate (JCC). Under the principle of versatility, do I have the right to perform any task at all on the construction site?

    No. Tasks performed under the principle of versatility must:

    • Be related to the tasks provided in the definition of the worker’s trade
    • Be part of a single work sequence and allow work, including preparatory or finishing work, to progress and continue
    • Be of short duration and performed in a single workday

    Furthermore, the principle of versatility does not apply to the operation of cranes of any type, to work related to a structure’s stability or load-bearing capacity, or to tasks in the following trades: electrician, pipe fitter, fire-protection mechanic, refrigeration mechanic, and elevator mechanic.

  • Can a person who holds an apprentice competency certificate (ACC) perform work related to his or her trade, without the supervision of a journeyperson in the same trade, for the majority of a work day, if that person also holds a journeyman competency certificate (JCC) in another trade?

    This situation is complex and requires a two-part answer.

    A person who holds a journeyman competency certificate may perform tasks related to the trade of his or her apprentice competency certificate without supervision only if these tasks:

    • Are of short duration in a workday
    • Are related to the tasks provided in the definition of the trade for which the person has the status of journeyperson 
    • Are part of a single work sequence and allow work, including preparatory or finishing work, to progress and continue

    However, if the person holding a journeyman competency certificate wishes to perform tasks related to the trade of his or her apprentice competency certificate for a longer period – for example, for the majority of a work day – that person must be under the supervision of a journeyperson in the same trade.

  • I hold a journeyman competency certificate (JCC). To perform tasks in another trade under the principle of versatility, is it necessary to apply for an apprentice competency certificate for this trade?

    No, the very principle of versatility allows only a person who holds a journeyman competency certificate to perform certain tasks from another trade, if these tasks:

    • Are related to the tasks provided in the definition of the person’s trade 
    • Are part of a single work sequence and allow work, including preparatory or finishing work, to progress and continue
    • Are of short duration in a workday

    However, the notion of versatility does not apply: 

    • to tasks in the following trades: electrician, pipe fitter, fire-protection mechanic, refrigeration mechanic, and elevator mechanic
    • to the operation of cranes of any type and to work related to a structure’s stability or load-bearing capacity

    To perform the tasks of another trade without having to comply with the conditions related to the principle of versatility, a person holding a journeyman competency certificate may also apply for an apprentice competency certificate in the trade in question. That person will then have to be under the supervision of a person with the status of journeyperson in the same trade to perform the tasks.